Thursday, March 13, 2014

A look at proposed site (11th March)

First day post the kickoffs and our teams walk early morning without client in tandem, taking a detour to visit the proposed site for the activities for which we are working on. Right on the shore with a migrant colony at its backyard. This neighbor was established by people from interiar parts of Chile moving to Puerto Montt for work.

The shore that we walked
 
Varied hues on houses. Striking colors these


The walk was all through against a scenic shore and yes, we did see some small dolphins swim through close to the coast line. Did not have enough time to get the camera and focus on this one. We were then informed that usually dolphins are visible a bit later at start of Winters in April time frame. Anyways, we did see the place an old Oil pipeline for vessels to transfer fuel to Industrial depot.

From there we headed to our newly painted block which will be our office for next few days. Had a round of discussion and got a 4 year old strategy document from the nodal agencies for an integrated view of the systems. This never kicked off due to various factors and new document is expected any time.

In between we all did step out of Lunch and it turned to be an elongated lunch. Not that we wanted it that way, but just going, coming and ordering was taking too much time. Need to figure out a faster way to close lunch.

After our days work, #ibmcsc Chile team headed back to our hotel, down the hill. This was followed by Dinner with Eric for all. He is leaving for Chicago while traveling through sites of upcoming CSC programs for next set of teams to enjoy. This was a German restaurant with Menu in German (Julia helped us with translations), true to the legacy of this place and its German connections.
At the dinner table

Masahiro and Evan enjoying drinks

No comments:

Post a Comment